We did get 3/4 sides done, but we ran out before we were able to complete the side with the french doors. That being said, there is a wonderful Amish owned/operated wood mill company minutes from the property that we planned to get the remaining wood from. Problem is, they are closed on the weekends. RobSr. and the Greek stepped in to save the day. They ventured today to get the wood we needed to complete the project AND to finish the floor with :)
I got this picture while at work:
We have to put the wood on this axel now because Mr. Sleeveless moved the trailer frame out of the way for us on Easter.
RobSr. decided he didn't drive all that way to not get some work done. Just a few short hours later, I got this picture of the final side of the Porchouse:
Seriously, he did everything except the batten hanging!
Doesn't it look amazing?
Doesn't this picture below look amazing?
Pappy Pyles got this contraption for us. It's a camp shower.
I also found this oldie on RobSr's phone. Back when our cabin was just a porch:
Gameplan this weekend:
Finish Battens
Build the steps out and add on a "deck"
Lay the flooring
Bake cookies for my cousin's cookie walk!!!
Maybe strip some wire
Have a fire
Celebrate someone's birthday :) :)
Stay tuned for my Pinterest inspired interior design!
0 comments:
Post a Comment